lapwings

Peel Energy's  planning application is for turbines 30% larger in power output than  "candidate turbine" used in noise calculations!

The turbine used in all the noise calculations is a 2.3mw (Siemens STW-2.3-93)

0.7mw lower than the 3mw in the planning application.!

ref:p251 Environmental statement vol 1, Appendix F2  Calculation tables and predicted noise levels,  Environmental statement vol 2, p.11 planning statement

p11 planning statement

planning 

p251 Environmental statement vol 1 

An assessment has been made using manufacturers warranted data for the proposed
Siemens STW-2.3-93 wind turbine as a candidate wind turbine for the purposes of the
assessment. From this assessment predictions of noise levels that would impact on
the nearest residential properties and surrounding area have been identified.


The predicted noise levels as a result of the operation of the proposed wind cluster
fall within the ETSU-R-97 noise limits at all of the nearest noise sensitive receptors. 

Comment - the predicted noise levels do not actually fall within ETSU-R-97 at all of the nearest noise sensitive receptors (i.e. homes), even using a much smaller turbine for the calculations.